How To Upload Unitronics V130 With Sd Card
Downloading/Uploading a Project
The Download process transfers your projection from the PC to the controller.
Build> Build All should be done before download, in order to locate project errors.
Communication connections
-
Standard Vision:
These back up Bone download via COM1, using a direct PC-PLC connexion: connecting the controller to the PC with the MJ10-22-CS25 programming cable.
Direct Connection must be selected in Communicate with OPLC.
Download via modem is also supported. The recommended baud rate is 57,600. -
Enhanced Vision
In improver to the modes listed above, these likewise support download via COM2, Ethernet, RS485, and CANbus bridge. The recommended baud rate is 115,200. -
Error: Variable (USBprogramming) is undefined.
These also back up download via USB cablevision (Blazon A to mini-B). COM port 1 office is suspended when the USB port is physically connected to a PC.
Annotation that you must install the USB driver provided by VisiLogic.
The recommended baud charge per unit over USB is 115,200.
-
Connect the controller to the PC.
-
Click Download on the Standard toolbar, or select an option from the Connectedness>Download menu.
-
The downloading procedure begins.
Notation ♦ | Utilise Remote Access to establish a advice line via modem or network. |
Download options
Annotation that Vision controllers contain ii types of retentivity:
-
RAM ( R andom A ccess M emory)
The controller uses RAM retentivity to run the awarding, brand calculations, and manipulate data.
RAM memory is volatile. This ways that it requires power in gild to maintain stored data.
Data stored in RAM:
The awarding, operand values, variable values, and Data Table sections that are non marked Office of Project.
This information, also as the RTC, is backed upward by the battery. -
FLASH (Flash Erasable Programmable Read-Only Retentiveness)
The controller uses FLASH retentiveness for data storage. and to shop backup applications.
Wink retentiveness is 'non-volatile'. It does non require ability in gild to maintain stored data.
Data stored in Flash:
Data Tabular array sections that are marked Part of Projection and Back-up applications, including applications that can be uploaded.
| Backing upward your application In order to make sure that your PLC can recover its application in the issue of total power loss--including battery failure--you must support your complete application in the FLASH memory. Note that this is the default Download fashion for all divisions, for VisiLogic 9.3.0 and up. If you To practise this, apply one of the following options from the Connection>Download menu, which differ according to the Vision Division yous controller belongs to:
|
Creating an Upload application file If the PLC contains an upload file, yous can upload and edit it using VisiLogic. To create an upload file, use one of the following options from the Connectedness>Download menu:
|
Note ♦ | Reset Controller at Download
In the following cases, the controller may asking reset
|
Pick | Annotate | Keystroke |
Download | When you download an edited application to the PLC,select this option to download changes alone. If there are many changes, the PLC may asking Reset. Standard Vision:This option burns an Upload file to the PLCs' FLASH retentivity. Enhanced Vision: This option does not fire an Upload file to Flash | Ctrl + D |
Finish-Download-Run (Standard but) | Automatically returns PLC to RUN way after download. If in that location are many changes, the PLC may asking Reset. | Alt + Ctrl + D |
Stop-Download-Reset | Forces Reset after download. | Alt + Ctrl + R |
Download All & Burn (Enhanced only) | Back ups the new awarding in the PLCs' Wink memory. Forces Reset after download. | Alt + Ctrl + A |
Fire 'Upload Project' (Enhanced only) | Enables the entire projection to be uploaded from the Vision PLC. Forces Reset subsequently download. | Alt + Ctrl + B |
Download and Create Download file | Run across topic Download and Create Download file. | none |
To upload a project from a controller:
-
Connect the controller to the PC.
-
Select Upload icon from the Connexion menu; the Vision Advice PC Settings window opens.
-
Select the connectedness blazon and click Go out; the uploading process begins.
Upload copies the consummate projection from the controller into the PC.
Via Project Properties, yous can apply upload and download options:
-
Assign a project password. Countersign protection requires users to enter a password before uploading a project to a PC.
-
Forbid project upload.
Note ♦ | Security restriction: if a PLC operator enters a wrong password 9 times, the PLC automatically disables program upload for that program. Resetting the PLC will enable you to try another 9 times. The limit attack countersign entry is intended to provide an additional layer of security. For instance, this tin foreclose a hacking script from entering a networked PLC, since the number of attempts is limited and such a script would not reset the PLC. |
Why tin't I upload a project from the PLC?
-
Project upload may take been disabled. In this case, the controller displays the following bulletin at upload: "This projection cannot be uploaded considering:
- the option 'Burn Upload Project' was not selected when the projection was downloaded,
or
- due to incomplete data in the PLC", and upload fails. -
You are non entering the correct Upload password set in the Project Properties of this project.
Are USB port adapters bachelor?
If your PC contains just USB ports, and your OPLC does not offer a USB port, y'all tin can connect a Unitronics OPLC via a compatible, external USB-to-serial converter.
Unitronics offers a USB-to-series converter that has been tested for compatibility with OPLC controllers. This converter can be ordered from local Unitronics distributor, using part number MJ10-22-CS35.
Source: https://unitronicsplc.com/Download/SoftwareHelp/VisiLogic_Knowledgebase/GETTING_STARTED/GETTING_STARTED/Downloading_Uploading_a_Project.htm
Posted by: martinhignaist.blogspot.com